The Sutter twist – an engineering story
Around 1966-7, at a time when the 747 program was burning about 5 million $ a day, the 747 engineering team led by Joe Sutter faced a sudden crisis. As they were moving towards building the first prototype, they found a major problem with their wing: the outer section was bearing too much load. An […]
The Sutter twist – an engineering story Read More »